Hi Guys.
I am trying patch the ERP system using SUM tool I extracted sum to SID location when I run startup.bat it works but when I access through it gives me following error kindly find the attached screen shots
Regards,
ibrahim
Hi Guys.
I am trying patch the ERP system using SUM tool I extracted sum to SID location when I run startup.bat it works but when I access through it gives me following error kindly find the attached screen shots
Regards,
ibrahim
Hi,
Suggest you to follow similar SCN thread at sap java.security.cert.certificateexception certificates does not conform to algorithm constraints error in SUM after i…
Hope this will help you.
Regards,
I did not see any responses looks like issue is more relevant to S4HANA forum and moved the same .
Will close the same here.
The Notes from SAP work sofr lower versions of SUM <= 14.
Now I cannot download the old versions
Only availabnle version is SUM1.0 level 16 patch 2.
Ok, I found the correct path.
The migration from Oracle/AIX is done to Windows 2012R2 mssql 2008R2 with modified kernel CD tihe latest 6.40 EXT2 kernel and sqlclient 2005 (for R3Load connection to DB)
After this the database is upgraded to 2012R2 (<60 min.)
from here it is a "Normal" SUM.
Hi,
Does anyone have solution for this issue?
I am stuck into this phase from last 4 days. have referred below SAP notes-
1460004 - High memory consumption in upgrade phase RUN_RSAIMMERGE_UPG
146289 - Parameter Recommendations for 64-Bit SAP Kernel
1442150 - RUN_RSAIMMERGE_TRANSFER: Long runtime during upgrade or EHPI
could not found patch 48 of lib_dbsl for SAP kernel release 740 as per SAP note
1954359 - SYB: SUM:RUN_RSAIMMERGE_TRANSFER fails
Appreciate your urgent response upon this to proceed.
Thank You,
Rupali
Hi Marcelo,
did you manage to overcome this issue?
Can you please share your resolution?
Best Regards,
Thomas
Hi All,
After I moved the DEV enviroment to other server in different network topology, the process of releasing transport request is taking long time to Quality enviroment.
In the SE09, after that I release child request, the parent request stay on "In process: Requires update" status for long time. The average time for a transport is 35 minutes to Quality enviroment.
The network traffic between the two servers is good. What could I do in SAP to improve performance?
Thanks & Regards
Ricardo.
Dear Experts,
We are planning to upgrade from EHP2 to EHP7 with DB conversion
Source System : Windows2k8/Oracle 10g [ERP 6.0 EHP3]
Target system: Windows2012/Sql2014 [ERP6.0 EHP7]
We trying to perform the DB [Oracle => SQL DB] conversion first and plan to upgrade from EHP3 to EHP as below.
Could you please confirm the below two steps are feasible?
Step1 => OS/DB migration [EHP3] to SQL 2014/Win2012 [EHP3]
Step2 =>Upgrade from EHP 3 to EHP8
Kindly let us know if there is any alterrnate best approach?
Thanks
Senthil.
Step 1
Step1 => OS/DB migration [EHP3] to SQL 2014/Win2012 [EHP3] -> Possible
Step2 =>Upgrade from EHP 3 to EHP8
Upgrade path from EHP3 for ERP 6.0 to EHP8.0 for ERP 6.0 with MS SQL SERVER 2014/X86_64 is possible.
Also upgrade path from EHP3 for ERP 6.0 to EHP7.0 for ERP 6.0 with MS SQL SERVER 2014/X86_64 is also available.
hi Marcelo,
did you check these notes?
71353 - Transports hang during background steps
556941 - Transport FAQ: Error scenarios
Regards,
Hi Marcelo
Are these security TRs? If yes then you can ask your security team to attach the roles in 3-4 transport request instead of one. A normal TR with 500 roles takes about 1-2 hrs to release.
If not from security then check the number of ABAP object in the TRs. Also check if the temp file is full.
/usr/sap/trans/tmp
Also follow the following SCN link
Hi, M. Abdul Jamil,
Yes, thanks for your response. I had already checked theses notes.
In my scenario, the transports are working, but is taking a long time to finish the import on the QAS enviroment. Before the change, the transportation was very fast.
Regards,
Ricardo.
I have notes that show obsolete but I cannot reset them or de-implement them. How do I get them out of SPAU?
Hi, Rajat Sarkar.
Thanks for your response.
Even when I created a blank request to test , is taking about 13 minutes. I checked the temp file and is not full.
My SAP version is ECC 6.0 EHP4 with IBM iSeries V7R1 and Database DB400. As I said in previous reply, before the change, the transportation was very fast.
I would like know why the Domain Controller is takes this time to finalize transport.
Any idea?
Regards,
Ricardo.
Hi Lowis.
Refer the SAP Notes
1293059 - C-CEE 110_604: Add-On Support Packages
1260936 - C-CEE 110_604: Installation or delta upgrade
Regards
SS
Hi,
For any support upgrade the below prerequisites need to check.
1) Take full backup before you upgrade,
2) Check the latest SPAM level and SAP BASIS component are met as per requirement.
3) Suspend the background job using (BTCTRNS1) and lock the user during upgrade.
4) Also check the space in directory "/usr/sap/SID".
3) Release open transport request confirmation.Don't not keep any modifiable/open request in the system.
Thanks & Regards,
Brindavan
Hi all
Thanks for the reply, do we also need to upgarde our current SAP_APPL SP level ?
Thanks
Lowis
Hi,
Check the required support upgrade level software and guide from the service market place for more details.
Thanks,
Brindavan