SUM tool issue

$
0
0

Hi Guys.

 

I am trying patch the ERP system using SUM tool I extracted sum to SID location when I run startup.bat it works but when I access through  it gives me following error kindly find the attached screen shots

 

Regards,

ibrahim


Re: SUM tool issue

Re: S4HANA upgrade 1511 - MAIN_NEWBAS/PARRUN_MKPF3_S4

$
0
0

I did not see any responses looks like issue is more relevant to   S4HANA forum and moved the same .

 

Will close the same here.

Re: SUM Screen Blank

$
0
0

The Notes from SAP work sofr lower versions of SUM <= 14.

 

Now I cannot download the old versions

 

Only availabnle version is SUM1.0 level 16 patch 2.

Re: Upgrade from ERP 5 to ERP 6.0 EHP 6

$
0
0

Ok, I found the correct path.

The migration from Oracle/AIX is done to Windows 2012R2 mssql 2008R2 with modified kernel CD tihe latest 6.40 EXT2 kernel and sqlclient 2005 (for R3Load connection to DB)

After this the database is upgraded to 2012R2 (<60 min.)

from here it is a "Normal" SUM.

Re: Background job running too long

$
0
0

Hi,

 

Does anyone have solution for this issue?

 

I am stuck into this phase from last 4 days. have referred below SAP notes-

 

1460004 - High memory consumption in upgrade phase RUN_RSAIMMERGE_UPG

146289 - Parameter Recommendations for 64-Bit SAP Kernel

1442150 - RUN_RSAIMMERGE_TRANSFER: Long runtime during upgrade or EHPI

 

 

could not found patch 48 of lib_dbsl for SAP kernel release 740 as per SAP note

 

1954359 - SYB: SUM:RUN_RSAIMMERGE_TRANSFER fails

 

Appreciate your urgent response upon this to proceed.

 

Thank You,

Rupali

Re: EHP4 to EHP7 Upgrade: Preprocessing error MAIN_SHDIMP/SUBMOD_SHDIMP/SHADOW_IMPORT_INC

$
0
0

Hi Marcelo,

did you manage to overcome this issue?
Can you please share your resolution?

 

Best Regards,

Thomas

Releasing transport request taking long time

$
0
0

Hi All,

 

 

 

After I moved the DEV enviroment to other server in different network topology, the process of releasing transport request is taking long time to Quality enviroment.

 

 

 

In the SE09, after that I release child request, the parent request stay on "In process: Requires update" status for long time. The average time for a transport is 35 minutes to Quality enviroment.

 

 

The network traffic between the two servers is good. What could I do in SAP to improve performance?

 

 

Thanks & Regards

 

 

Ricardo.


EHP2 Upgrade

$
0
0

Dear Experts,

 

We are planning to upgrade from EHP2 to EHP7 with DB conversion

 

Source System : Windows2k8/Oracle 10g  [ERP 6.0 EHP3]

Target system: Windows2012/Sql2014  [ERP6.0 EHP7]

 

 

We trying to perform the DB [Oracle => SQL DB]  conversion first and plan to upgrade from EHP3 to EHP as below.

Could you please confirm the below two steps are feasible?

 

Step1 =>  OS/DB migration [EHP3]  to SQL 2014/Win2012 [EHP3]

 

Step2 =>Upgrade from EHP 3 to EHP8

 

 

Kindly let us know if there is any alterrnate best approach?

 

Thanks
Senthil.

Re: EHP2 Upgrade

$
0
0

Step 1

Step1 =>  OS/DB migration [EHP3]  to SQL 2014/Win2012 [EHP3] -> Possible

 

Step2 =>Upgrade from EHP 3 to EHP8


Upgrade path from EHP3 for ERP 6.0 to EHP8.0 for ERP 6.0 with MS SQL SERVER 2014/X86_64 is possible.


Also upgrade path from EHP3 for ERP 6.0 to EHP7.0 for ERP 6.0 with MS SQL SERVER 2014/X86_64 is also available.

Re: Releasing transport request taking long time

$
0
0

hi Marcelo,

 

did you check these notes?

71353 - Transports hang during background steps

556941 - Transport FAQ: Error scenarios

 

 

Regards,

Re: Releasing transport request taking long time

$
0
0

Hi Marcelo

 

Are these security TRs? If yes then you can ask your security team to attach the roles in 3-4 transport request instead of one. A normal TR with 500 roles takes about 1-2 hrs to release.

 

If not from security then check the number of  ABAP object in the TRs. Also check if the temp file is full.

/usr/sap/trans/tmp


Also follow the following SCN link


Transport (STMS) issue + Hang

Re: Releasing transport request taking long time

$
0
0

Hi, M. Abdul Jamil,

 

Yes, thanks for your response. I had already checked theses notes.

 

In my scenario, the transports are working, but is taking a long time to finish the import on the QAS enviroment. Before the change, the transportation was very fast.

 

Regards,

 

Ricardo.

Obsolet Notes removal

$
0
0

I have notes that show obsolete but I cannot reset them or de-implement them.  How do I get them out of SPAU?

Re: Releasing transport request taking long time

$
0
0

Hi, Rajat Sarkar.

 

 

 

Thanks for your response.

 

 

 

 

 

Even when I created a blank request to test , is taking about 13 minutes. I checked the temp file and is not full.

 

 

 

My SAP version is ECC 6.0 EHP4 with IBM iSeries V7R1 and Database DB400. As I said in previous reply, before the change, the transportation was very fast.

 

 

 

I would like know why the Domain Controller is takes this time to finalize transport.

 

Any idea?

 

 

 

Regards,

 

 

 

Ricardo.


Re: C-CEE 110_604 Upgrade support package from 21 to 28

Re: C-CEE 110_604 Upgrade support package from 21 to 28

$
0
0

Hi,

 

For any support upgrade the below prerequisites need to check.

 

1) Take full backup before you upgrade,

2) Check the latest SPAM level and SAP BASIS component are met as per requirement.

3) Suspend the background job using (BTCTRNS1) and lock the user during upgrade.

4) Also check the space in directory "/usr/sap/SID".

3)  Release open  transport request confirmation.Don't not keep any modifiable/open request in the system.

 

Thanks & Regards,

Brindavan

Re: C-CEE 110_604 Upgrade support package from 21 to 28

$
0
0

Hi all

 

Thanks for the reply, do we also need to upgarde our current SAP_APPL SP level ?

 

Thanks

Lowis

Re: C-CEE 110_604 Upgrade support package from 21 to 28

$
0
0

Hi,

 

Check the required support upgrade level software and guide from the service market place for more details.

 

Thanks,

Brindavan

SPDD activities zero during upgrade.

$
0
0

Hi friends,

 

         We are upgrading our SAP ECC 6 to Service pack 15 .

         In SPDD phase  it is not showing any changes in SPDD tcode

         can anyone pls help me with this?.

Capture.JPG