The SUM tool will trigger the DBCLONE jobs in the main system for the clone operation. Connect to the main system and check the status of the jobs. If they are shown active then do a "Check Status" for these jobs and see if the status changes. If they are failed then the SUM tool will end up in error. You should then be able to repeat the phase.
↧