Re: Requests cannot be released during the upgrade
HelloBefore the Pre Processing phase there will be a check done by the upgrade tool for the open requests and will prompt you to release them.Was there an SAP note implemented at this stage (Pre...
View ArticleRe: SAP EHP Update for Large Database
Thanks for providing the information.Let me check and come back to you.Hope i can increase the RAM to accommodate the parallel process as am having only 32GB so i doubt i cant go with parallel...
View ArticleRe: MOPZ upgrade EHP4/NW701 to ECC6 EHP7
HelloFirst check whether the system is properly defined in the Solution Manager LMDB.Tx LMDB - SID - Software - Software Components Versions RegardsRB
View ArticleRe: Upgrade Path is not supported
Hi Gaurav, As per the SAP notes shared above as well as PAM , there is not direct upgrade path from ECC 5.0 to EHP7. PAM link for...
View ArticleRe: Upgrade Path is not supported
Good Day GauravI strongly suggest you to raise an OSS message with SAP and get this clarified.SUM guide says that the upgrade from ERP 5.0 to ECC 6.0 EHP 7 is possible.RegardsRB
View ArticleRe: How to establish an RFC connection between SAP and Non-SAP Systems
HelloAs the SAP system is running on Linux have you thought of exporting the data to the OS level using a shell script and then transfer it to the server where PHP application is running ?Once the data...
View ArticleRe: Severe error(s) occurred in phase MAIN_NEWBAS/MVNTAB_UPG!
Hi Gaurav , I faced same kind f issue while upgrading to EHP7 ,in Execution phase . Kindly advice how to fix this in detail because i can't login to system to delete . below is the error log .......
View ArticleRunning the Shadow Instance Remotely in NAS
Hi everybody: We try to upgrade our ERP EHP6 to EHP7 with SUM tool, but in the aplication server we don´t have enough free space to operate with the shadow instance, we have a NAS(Network-attached...
View ArticleRe: Severe error(s) occurred in phase MAIN_NEWBAS/MVNTAB_UPG!
Hello Mohan,2EETP345 23:44:29: Retcode 1: SQL-error "918-ORA-00918: column ambiguously defined" in DDL statemen Can you check the P* logs to find the DDL statement. Thanks. Regards,Gaurav
View ArticleSTMS import of transport
Hi Guys, I'm trying to import a transport during upgrade from dev to quality. I need to have it in 005 quality. 1) Is it necessary to login to the target client 005 or can I directly login to 000 and...
View ArticleRe: Severe error(s) occurred in phase MAIN_NEWBAS/MVNTAB_UPG!
Hi Gaurav, I have attached the P*Log files below for more information but same information returned as above . Kindly advice ThanksMohan
View ArticleRe: Severe error(s) occurred in phase MAIN_NEWBAS/MVNTAB_UPG!
Hi Mohan, Please find the solution as below: Resolution : Start the SAP instance with command >startsap r3 and logged on to system with client 000 user DDICas in execution phase you'll not be able...
View ArticleRe: Upgrade Path is not supported
Hi RB, Greetings for the Day !! Thanks for your suggestions.As i also searched on SAP Solution Browser It's showing EHP7 functionality after selecting Source as SAP ERP 2004 & Target as SAP 6.0...
View ArticleRe: EHP7 Upgrade with kernel 740 Sp37
I never seen a combination of 8 / 40 before that but I cannot confirm whether this is normal but I believe the tool calculates based on the system resources (unless you have changed them). RegardsRB
View ArticleRe: EHP7 Upgrade with kernel 740 Sp37
Thanks RB, I also didn't see when I did last EHP6 update on same server. I am using SUM 1.0 SP09 patch 7. And 8/40 was default values for "STANDARD" mode R3Load. My server has 16GB RAM and 4 CPUs....
View ArticleRe: EHP7 Upgrade with kernel 740 Sp37
Thanks Is this something related to nZDM/SUM ? I am not sure. RegardsSS
View ArticleRe: ERROR Batchjob RSVBCHCK failed in preprocessing phase
The error solved for us too. Thank you for the suggestion. Kind Regards,Jacob
View ArticleQuestion over release notes for SAP Upgrade from 4.6 to ECC 6.0 (Retail)
Hi everyone, My name is Mohammed, I have just started out on my first project as a junior SAP consultant, the project is focuses on an upgrade from R/3 4.6 to 6.0, the client is a large supermarket...
View ArticleRe: Requests cannot be released during the upgrade
Hi All After updating table UVERS, all urgent requests were able to be released. Bear in mind, this was during Preprocessin, where Development was already lock, therefore this workaround. Thanks
View Article