Re: SAP ECC6.0 Upgrade to EhP5 or EhP6

As there is no indication as to what the underlying database is, I cannot be specific here. If you read the EHP installation / update guide it clearly says the filesystems requirements for the SUM tool...

View Article


additional ECC installation

Hi All, Suppose we already have SAP ECC with system ID E00I want to install another ECC. So it is possible that, without using sapinst, if I had copied entire E00 folder from /usr.sap/..... and past it...

View Article


Re: additional ECC installation

Hi Ibrahim, I would not recommend this way. I assume this will not work.Go for a simple System Copy Export/Import. This will not take much time. Best regards,Andreas

View Article

Re: SAP Note Implementation in EHP Upgrade

Dear Gaurav,Appreciate your reply that procedure worked for all other notes till now but  this note 1994245 is not downloadable, you can try downloading it.   Regards,Domnic.

View Article

Re: SAP Note Implementation in EHP Upgrade

Dear Yaungket,I know that procedure but it is not working for this particular note.If it works at your side you can mail me the RAR file at dominc099@gmail.com,I would be glad.   Regards,Domnic.

View Article


Re: SAP Note Implementation in EHP Upgrade

HI Dominic, Whats the issue you have when you try downloading the Note ? BR,Gaurav

View Article

Re: Upgrade STARTUP program error

Hello, I'm facing a similar problem. I tried to start the SUM on our SolMan but I get the following error message: > ./STARTUP*** Checking if C++ runtime is installed ...*** Starting from...

View Article

Image may be NSFW.
Clik here to view.

Re: SCM upgrade deletes modification done by SAP

If someone has the answer to this question, or how to identify where customizing are made, eventhough warning raised that its in SAP namespace, I would be happy to know the answer

View Article


Re: SAP ECC6.0 Upgrade to EhP5 or EhP6

AIX with oracle DB.

View Article


Re: SAP ECC6.0 Upgrade to EhP5 or EhP6

You will need to make sure that you have enough space in the sapdata filesystems to create a tablespace called PSAPSR3731 for the upgrade. I believe the space would be in the range of 80 GB to 120 GB....

View Article

Error During Upgrade from ecc6.0 to ehp7 in phase...

Dear all,Please give me the solution as soon as possible working in down time.3 ETGCLN VARI : only client 000 will be copied3 ETGCLN insert into "VARI~" ( "MANDT", "RELID", "REPORT", "VARIANT",...

View Article

Re: Error During Upgrade from ecc6.0 to ehp7 in phase...

Hi, Could you share complete error log file for further suggestions. Regards,

View Article

Re: Error During Upgrade from ecc6.0 to ehp7 in phase...

Thanks for the Urgent reply ETGCLN START VARI -> VARI~ 20150919065130 3 ETGCLN Primary key strategy for current table is 03 ETGCLN CREATE TABLE "VARI~" ("MANDT" SAPDB6CHAR(000003) DEFAULT '000' NOT...

View Article


Re: Error During Upgrade from ecc6.0 to ehp7 in phase...

Hi,Please attach logs files of SAPupConsole.log and ELG and other logs file to thread.Regards, Prem

View Article

Re: Error During Upgrade from ecc6.0 to ehp7 in phase...

Dear Prem, This trouble ticket was created by SAPup on 20150920061001 -------------------------------------------------------------SAPup broke during phase SUBMOD_SHDDBCLONE/DBCLONE in module...

View Article


SUM PREP_INPUT/CONFCHK_IMP DB to low

Hi All,  I am preparing a Sandbox upgrade of ERP 6.0 EHP6 to EHP 7 SUM SP14 I have checked /PAM and the notes from SUM SP 14 upgrade guide and I should be able to upgrade on the current DB, but SUM...

View Article

Re: SUM PREP_INPUT/CONFCHK_IMP DB to low

Hi Torben, Could you also let me know the Target SPS level for your upgrade.Please check the KBA 1956279 whic BR,Gaurav

View Article


Re: SUM PREP_INPUT/CONFCHK_IMP DB to low

Hi GauravWe are gooing for SP 9 and it looks like we need to upgrade DB to 2012 Thanks

View Article

include change request - Is this for source or target release?

Hi gurus, In the enhancement package upgrade from EHP5 to EHP6, it asks to include a change request where we can add  a customer transport that we created in development.  We have a lot of transports...

View Article

Is it possible to upgrade BW with downtime minimized?

Hi gurus, Have you upgraded a BW system using "downtime minimized" (now called standard mode in SUM)?   The reason for the doubt is this note 851449 - "Changeability of BW objects during the upgrade"...

View Article