Re: Memory Error in pre-processing phase MAIN_SHDRUN/ACT_UPG
Hi Rahul, Operating System HPUX11.31Database ORACLE 11.2.0.4RAM is 16GB,SWAP Size is 40GB. I have updated my shadow instance Kernel 742 release to 200 and also updated the tp to level 211 of SAP KERNEL...
View ArticleRe: Memory Error in pre-processing phase MAIN_SHDRUN/ACT_UPG
Hi Anand, As per the thread: 1. Space is enough2. No tablesapce is running out of space3. tp is connecting wellany other suggestions? Santosh
View ArticleRe: Memory Error in pre-processing phase MAIN_SHDRUN/ACT_UPG
Stop and start the shadow instance manually & check the memory/CPU utilization while both the instance are running(main & shadow instance).Also check the below KBA:172747 SAP on HPUX:OS kernel...
View ArticleRe: Memory Error in pre-processing phase MAIN_SHDRUN/ACT_UPG
Hello Santosh, Please check Import log in SPAM. I could see error are reported. Apart from this did you get a chance to look at SAP note:- 1563583 - SYSTEM_NO_TASK_STORAGE, DBIF_RSQL_NO_MEMORY,...
View ArticleRe: Memory Error in pre-processing phase MAIN_SHDRUN/ACT_UPG
Almost all memory is in use and total is close to 100%: ============================================================== [1.3] SYSTEM PAGING SPACE (swapinfo -tm) Mb Mb...
View ArticleRe: Memory Error in pre-processing phase MAIN_SHDRUN/ACT_UPG
As per the logs sent ,Your Swap Memory is not enough to run the both instance simultaneously.As a work around, Have you tried to stop the main instance and then run only the shadow instance?Also ask...
View ArticleRe: Memory Error in pre-processing phase MAIN_SHDRUN/ACT_UPG
I have stopped the main R3 instance, Now only the shadow instance is Up and running.I have started the upgrade from the point it stopped, I see its running quite fine now, and It has gone by far the...
View ArticleRe: Memory Error in pre-processing phase MAIN_SHDRUN/ACT_UPG
Great!!! For a fair solution,you should now increase your swap size. BR,Rahul
View ArticleSAP EHP7 Upgrade
Hi, We are upgrading our ECC EHP7 to latest version, current SAP version is SAP ECC EHP5 SP 9. To goto the latest version we need to upgrade SQL server into 2012, in order to do sql upgrade we need to...
View ArticleRe: Print problem with SAPSprint in Window 7
I have same problem in Windows2008 R2 with SAPSprint version 730 or 740, 32bit or 64bit.SAP support give such information:Chinese character can only be substition with fonts which include code page 936.
View ArticleRe: Heterogenous system Copy ERP 6.0
Ciao Abert I see completely your point. If you are the real decision maker, just go for Linux and both your users and you will be happy If you are not in a position to decide but you want to support...
View ArticleRe: Error in SUBMOD_FDC_PREP/RUN_FDC4UPG_PREPROC in module MAIN_SHDRUN
Checked following entries:SAPLOCALHOST in Windows System PropertiesShadow Instance Profile --- RZ10 SAPLOCAL HOST EntryShadow Instance --- SM51 Hostname entry------Note: All 3 Parameters have to...
View ArticleRe: SAP EHP7 Upgrade
Suganthi AN wrote: Hi, We are upgrading our ECC EHP7 to latest version, current SAP version is SAP ECC EHP5 SP 9. You are upgrading your EHP7. And current version EHP5.Confused? Please clarify to get...
View ArticleRe: SAP EHP7 Upgrade
Hi, We are in SAP ECC6 EHP5 SP9, planning to upgrade to SAP ECC6 EHP7 Latest SP Please advise
View ArticleRe: SAP EHP7 Upgrade
Hi Suganthi, The best way to go about in my view would be to first patch EHP5 SP9 to EHP5 SP11 and then upgrade SQL, this will not take long and can be done on a weekend.Then you have a week for users...
View ArticleRe: Heterogenous system Copy ERP 6.0
Hi Albert, I am in total agreement with Andrea, you need to consider lot of factors like integration to non SAP system, stability, OS and DB compatibility, Endian byte order etc. Personally I would be...
View ArticleRe: SAP EHP7 Upgrade
Hello Suganthi, If SQL upgrade and SAP upgrade depend to each other; then you must fulfill the requirements step by step. You can not upgrade your ECC system to EHP7 at the beginning, because of your...
View ArticleRe: ./SAPup reset prepare & -nr
Hello Evgeniy, Can you to solve the error? I have the same error. Thanks in advanced!
View ArticleInsufficient free space in the database during ERP6 upgrade in checks phase
Dear Experts, We are upgrading R/3 4.7 system to ECC6.0 EHP7, stuck with an error at the CHECKS phase. OS is AIX 6.1 & DAtabase is DB2 9.7 FP10. Got below error message in Checks phase. ERROR:...
View ArticleRe: Insufficient free space in the database during ERP6 upgrade in checks phase
Issue resolved after creating containers manually for the mentioned tablespaces with specified sizes.Thanks,Vinay
View Article