Hello All,
I am in preparation Phase. In the "Stopped in phase MAIN_DTTRANS/STOPSAP_DTTRANS"
The upgrade has locked main instance,
How can I unlock main instance. I need to run SMQ1 and delete some table index befor Execution phase.
Pleas any help?
Thanks